PACIFIC OUTLOOK ESTATE
90 lot residential subdivision - project management and engineering supervision.
90 lot multiple staged residential sub division
- Preparation of construction cost estimate and contract documentation for tender purposes
- Review and make recommendation on suitable contractors
- Engineering supervision
- Contract management
- As constructed submission and certification
- Local authority liaison
CLERMONT NORTH
30 lot industrial subdivision - operational works design and engineering supervision. Ongoing multi staged development.
30 lot industrial subdivision with B-double access Clermont, Queensland
- Preparation of Stormwater Management Plan including MUSIC modelling
- Traffic impact assessment and road network impact assessment to GARID
- Design and documentation of stormwater drainage network
- Design and documentation of stormwater basin and bio-infiltration treatment facility
- Design and documentation of roads and site earthworks
- Design and documentation of intersection with Gregory Highway (statecontrolled road) for type 2 road train access
- Preparation of environmental, sedimentation and erosion management plans
- Preparation of construction cost estimate and contract documentation for tender purposes
CANOME ESTATE ON TANBY
50 lot park residential subdivision - operational works design and documentation.
50 lot park residential subdivision, Tanby Queensland
- Preparation of Stormwater Management Plan including MUSIC modelling
- Design and documentation of stormwater drainage network
- Design and documentation of detention basin and bio-infiltration treatment facility
- Design and documentation of roads, drainage swales and site earthworks
- Design and documentation of gravity sewer network
- Preparation of Environmental, Sedimentation and Erosion Management plans
- Preparation of construction cost estimate and contract documentation for tender purposes
BOC GAS & GEAR ROCKHAMPTON
Operational works and structural design & documentation.
4,000m² commercial development on contaminated land
- Structural design and documentation of structural reinforced concrete structure
- Preparation of Stormwater Management Plan
- Design and documentation of underground stormwater pipe network
- Site earthworks design and documentation to achieve a cut/fill balance of 0, whilst excavating 500mm of contaminated material from areas to be landscaped
- Preparation of Environmental, Sedimentation and Erosion Management plans
- Preparation of operational works cost estimate, application documentation and administration of application process
KENT STREET RECONSTRUCTION
Design and documentation - North Street to Albert Street.
Reprofiling, stabilisation and drainage upgrade of Kent Street, Rockhampton
- Assessment of existing drainage system
- Design upgrade of existing drainage system
- Design and document for pavement profiling and stabilisation including kerb and channel replacement where required
- Construction cost estimates
UPPER DAWSON ROAD DRAINAGE UPGRADE
Wiseman Street to Bruce Highway.
Drainage investigation to identify required drainage system upgrades
- Assessment of existing drainage system
- Design upgrade of existing drainage system
- Design and document trunk drainage upgrade
- Construction cost estimates
MOSTYN STREET DRAINAGE UPGRADED
Mostyn Street to Frenchman’s Creek.
Drainage investigation to identify required drainage system upgrades
- Assessment of existing drainage system
- Design upgrade of existing drainage system
- Design and document trunk drainage upgrade
- Construction cost estimates
YEPPOON TENNIS DEVELOPMENT
Project management.
8 Tennis Courts and Associated Infrastructure including $550,000 Clubhouse
- Project management for construction phase
- Superintendent’s representative, contract administration
- Stakeholder consultation
RICHMOND STREET UNITS
Operational works design, documentation and supervision.
Multiple unit development
- Preparation of Stormwater Management Plan including MUSIC modelling
- Operational works design and documentation
- Application management
- Engineering supervision of earthworks, access works and drainage
- As constructed submission and compliance
- Local government liaison
CHARLES STREET UNITS
Operational works design, documentation and supervision.
Multiple unit development
- Structural design and documentation of two-storey multi-unit structure
- Preparation of Stormwater Management Plan including MUSIC modelling
- Operational works design and documentation
- Application management
- Engineering supervision of earthworks, access works and drainage
- As constructed submission and compliance
- Local government liaison
LUCAS STREET WASTE TRANSFER FACILITY
Waste Transfer Facility, Gracemere.
Redevelopment of exhausted quarry site to construction and demolition waste transfer facility and landfill
- Preparation of traffic impact assessment on local road network
- Preparation of storm water management plan including MUSIC modelling
- Preparation of site waste acceptance policy
- Preparation of operational works application documentation and administration of application process
- Site based operational management plan and procedures
CAIRNS AND ROCKHAMPTON DIRECT FREIGHT DEPOTS
Material change of use and operational works design and documentation.
Commercial road freight depot developments
- Non-impact assessable material change of use application reports
- Preparation of Stormwater Management Plan including MUSIC modelling
- Design and documentation of underground stormwater pipe network
- Site earthworks design and documentation to achieve a 0 cut/fill balance
- Preparation of Environmental, Sedimentation and Erosion Management plans
- Preparation of operational works cost estimate, application documentation and administration of application process
- Operational works supervision
BOULDERCOMBE GRANITE QUARRY
Engineering planning, traffic and access design.
Development of a greenfield site for a 100,000 ton extraction operation
- Preparation of traffic impact assessment on local road network
- Preparation of road impact assessment on surrounding road network
- Preparation of Stormwater Management Plan including MUSIC modelling
- Transport and main roads liaison
- Development of schematic design
- Design and documentation of quarry access with state controlled road
- Site based Operational Management Plan and extraction plan
BOUNDARY ROAD COMMERCIAL DEVELOPMENT
Material change of use, operational works and structural design and documentation controlled road.
Redevelopment of existing commercial site including a new 1260m² showroom/workshop facility, and additions to an existing steel portal frame workshop and showroom
- Structural design and documentation of structural reinforced concrete structure
- Preparation of Stormwater Management Plan including MUSIC modelling
- Design and documentation of underground stormwater pipe network
- Site earthworks design and documentation
- Preparation of Environmental, Sedimentation and Erosion Management plans.
- Preparation of operational works cost estimate, application documentation and administration of application process